A tier-1 automotive supplier was stuck in reactive mode always firefighting, never improving. This example shows how we replaced chaos with structured short-interval control.
At a glance
- Industry: Automotive tier-1 supplier (stamping and assembly)
- Lines: 3 stamping presses + 2 assembly cells
- Products used: XL HD+,
- Timeline: 12-week implementation + coaching
The problem: every stop was an emergency
The plant ran on adrenaline. When a press stopped, a supervisor ran over. Maintenance was called by shouting across the hall. The same top-five failures repeated weekly, but nobody had time to work on root causes because they were always reacting. Mean time to respond to an unplanned stop was 22 minutes. OEE sat at 58% and had not moved in two years.
What we set up
XL HD+ on every line for real-time OEE visibility and structured downtime capture. Xl Enterprise was configured to send instant alerts to the right responder maintenance for mechanical stops, quality for reject spikes, supervisors for changeover overruns. XL Reports provided the Pareto analysis that drove weekly improvement meetings.
The leadership team was coached through a 12-week short-interval control programme: daily 15-minute stand-ups at the XL dashboard, weekly loss analysis, and monthly improvement reviews with quantified targets.
Results after 12 weeks
- Mean time to respond to stops: from 22 minutes to 8 minutes (−64%)
- OEE: from 58% to 71% (+13 points)
- Scrap rate: −18%
- Recurring top-5 failures: 3 of 5 eliminated through root-cause countermeasures
- Overtime hours: −35% (previously needed to compensate for lost production)
How?
The alerts and dashboards created visibility; Our coaching created the discipline to act on it. The plant manager noted: “We had data before, but it sat in spreadsheets nobody opened. Now it drives every conversation on the floor.”