Book a Live DemoSchedule a CallFollow on LinkedIn
Solutions · Manufacturing Intelligence

Manufacturing Intelligence, Connect Data From Machine to Organisation

Manufacturing intelligence starts with reliable production data. Vorne XL can capture, structure, display and analyse production performance directly at the line. ACI configures, connects and coaches the whole solution across Benelux and Europe.

When requirements go further, additional data sources, ERP integration, workforce tracking, customised dashboards, forms or broader workflows, ACI extends the solution using Vorne integration capabilities, ACI Performance Modules and your existing systems.

Start with what you need. Build on what you already have.
The Foundation

Start with reliable production data

Before you can analyse performance, compare lines or connect production to ERP, the information underneath needs to be accurate. For many manufacturers, Vorne XL is the practical starting point.

Connected directly to the production process, XL automatically captures and calculates:

  • Actual production
  • Target versus actual
  • Running, slow and stopped time
  • OEE, Availability, Performance and Quality
  • Downtime and reason codes
  • Small stops
  • Speed and cycle-time losses
  • Changeovers
  • Quality losses
  • Shift performance
  • Production trends
Operatorssee what is happening now.
Supervisorssee what is affecting the shift.
Managementanalyse where capacity is being lost.
Explore Real-Time Production Visibility →
Vorne XL scoreboard capturing real-time production data on the line
The Reality

But production data rarely lives in one system

A typical factory already has useful information spread across several places. The challenge is not collecting more data. It is bringing what already exists together without creating another isolated system.

XL

Vorne XL

Production performance, downtime, counts, OEE and line status.

PLC

PLCs & Machines

Cycles, states, speeds, counters and process signals.

ERP

ERP

Jobs, products, customers, quantities, standards and schedules.

MES

MES / SCADA

Production and process information already flowing through the plant.

DB

Databases

Historical and operational data captured over time.

OPS

Operators

Reasons, comments, checks, interventions and production context.

A Practical Example

Your ERP knows the job. Your production system knows what happened.

Suppose SAP or another ERP already contains the plan, and Vorne XL is measuring the reality. Instead of typing the same information into several systems, connect them.

ERP knows
The plan
  • Job number
  • Product & customer
  • Planned quantity
  • Standard cycle time
  • Production schedule
+
XL / Machine knows
The reality
  • Actual production
  • Running & downtime
  • Speed
  • Rejects
  • Current state
+
Operator adds
The context
  • Downtime reason
  • Comments
  • Quality information
  • Checks & actions
→ One complete production picture

What were we supposed to make?

What did we actually make?

Where did we lose time?

Why did we lose it?

What should we address next?

How It Fits Together

How the solutions work together

Three layers, each adding depth. You do not need to implement everything at once. Start with the requirement that solves a real problem.

Vorne XL production monitor on the line
1

Vorne XL

Production intelligence at the line.

  • Automatically collect production data
  • Make performance visible to operators
  • Calculate OEE and production losses
  • Capture downtime and reason codes
  • Standard reports and dashboards
Explore Vorne XL →
Vorne XL HD scoreboard connected across multiple production lines
2

Vorne Integration

Connect XL with the wider plant.

  • Bring jobs and standards from ERP
  • Use PLC information
  • Export XL production data
  • Consolidate several XL systems
  • Feed corporate reporting
  • Connect databases, MES or other apps
Explore Integration →
ACI Performance Modules executive summary with plant-wide performance charts
3

ACI Performance Modules

Extend the application where needed.

  • Central dashboards across systems
  • Job and workforce tracking
  • Customised forms and workflows
  • Alerts and notifications
  • Deeper or customised analysis
  • ERP and database integration
Explore ACI Performance Modules →
The Product Family

Every product ACI configures and supports

Vorne XL hardware at the line, plus ACI Performance Modules software beyond it. Pick the ones that solve your problem today. Extend when you are ready.

ACI Performance ModulesSoftware beyond the line
One Picture, Every Role

One production picture, different questions

Everyone works from the same numbers. Each role sees the answers that matter to their job.

Operator
  • What job am I running?
  • What is my target?
  • Are we on schedule?
  • Why are we stopped?

Runs the shift without searching through several systems.

Supervisor
  • Which line needs attention?
  • What is behind schedule?
  • Where did we lose time today?
  • Which problem keeps returning?

Focuses on exceptions instead of checking everything manually.

Production Manager
  • Where are we losing capacity?
  • Which lines or shifts perform differently?
  • Are improvement actions working?
  • Where should we focus next?

The discussion moves from reporting to improving performance.

Group / Multi-site
  • Are our plants measuring consistently?
  • Where are the largest differences?
  • Which sites have practices worth sharing?

Common visibility without forcing every plant to replace what it has.

Getting Started

Start with one practical requirement

You do not need to begin with a factory-wide digitalisation project. The best first projects are very specific.

“We want to know what is really happening on this line.”
Start with Vorne XL.
“We want all our XL lines on one central view.”
Use existing XL data and extend with OEE Explorer.
“Our jobs already exist in SAP. Operators should not type them again.”
Connect the ERP with the production workflow.
“We have XL on some lines and PLC data on others.”
Bring the different sources into a common operational view.
“We want to track jobs, operators and technicians as well as machines.”
Add OEE Work Tracker.
“Management wants dashboards combining several production systems.”
Use Explorer or Pulse for consolidated dashboards and alerts.
“We find out about downtime too late.”
Add OEE Pulse so the right people react sooner.
“Our manual area still uses paper and Excel.”
Add a manual or virtual workstation without forcing full automation.
Beyond a Single Number

More than an OEE number

An OEE result alone tells you the score. It does not tell you where the loss is or what to do about it.

OEE
67%

Useful, but not enough. The real questions are:

  • Which line is creating the loss?
  • Is downtime or speed the bigger problem?
  • Which reason occurs most frequently?
  • Which product performs differently?
  • Does one shift consistently lose more time?
  • Are changeovers getting better or worse?
  • Which jobs are taking longer than planned?
  • Are the same losses returning every week?
  • Which loss should we work on first?

Manufacturing intelligence should help answer these questions. The objective is not more dashboards. It is better decisions.

Use What You Have

Use the systems you already have

ACI does not start from the assumption that everything needs replacing. If useful information already exists, we look at how to use it first. In some plants XL alone is sufficient. In others, XL is the foundation and additional systems connect around it.

Vorne XL systems

Existing XL scoreboards and networks.

Machines & PLCs

Existing controllers, sensors and counters.

ERP

Jobs, products, standards and schedules.

MES & SCADA

Existing production and process systems.

SQL Databases

Historical and operational stores.

Reporting Tools

Power BI, Excel, Access, existing dashboards.

Already using Excel, Access or Power BI?

You may not need to stop. ERP supplies jobs and master data. XL or PLCs supply production data. ACI Performance Modules supports operational dashboards, workflows and analysis. Power BI, Access or Excel can continue to use shared information where useful.

The goal is to avoid

  • Manual re-entry
  • Conflicting numbers
  • Disconnected databases
  • Reports that take hours to prepare
  • Important information arriving too late
ACI’s Role

Start with the production requirement, not the software

The technical connection is only part of the work. The operational questions matter more:

  • What information does the operator really need?
  • Which signals should be collected automatically?
  • Which information should come from ERP?
  • Which production standards should be used?
  • Which downtime reasons are useful?
  • What should trigger an alert?
  • Who should receive it?
  • Which dashboards are needed in daily meetings?
  • Which information is useful for management?
  • Where should people still add context?
  • Where would additional technology simply create complexity?

Since 1997, ACI has coached continuous improvement and configured Vorne XL and ACI Performance Modules for manufacturers across Benelux and Europe.

ACI works with production, continuous improvement and IT to answer these questions first. Then we configure the appropriate solution around them. This can involve:

Vorne XL Vorne integration tools ACI Performance Modules Existing ERP / PLC / MES Or a combination
“Technology is the enabler. Better production performance is the objective.”
ACI coaching production team from data to improvement
From Data to Improvement

Manufacturing intelligence only has value when somebody acts on it

ACI helps teams use the information to improve, not just report.

  • Identify the largest production losses
  • Prioritise improvement opportunities
  • Improve downtime analysis
  • Reduce speed losses
  • Improve changeovers
  • Structure daily performance meetings
  • Coach supervisors and operators
  • Follow whether actions actually produce results
Explore Performance Improvement →
Not Sure Where to Start?

Tell us one practical problem

ACI can review what you already have and show you a practical route forward. Sometimes that means Vorne XL. Sometimes it means extending the existing XL environment. Sometimes it means adding ACI Performance Modules. And sometimes the best answer is to use the systems you already have more effectively.

  • “We want to see all 15 lines in one place.”
  • “We need better OEE reporting without more Excel work.”
  • “SAP already has our jobs, but operators enter them again.”
  • “We have XL on some lines and other systems elsewhere.”
  • “We want to know where our biggest production losses really are.”
  • “Management wants one view across several plants.”
Trusted Across Benelux

Local expertise, European reach

Since 1997, based in Bonheiden, Belgium. ACI configures Vorne XL and ACI Performance Modules for manufacturers across food, pharma, packaging, automotive, metal, electronics and general manufacturing throughout the Benelux and Europe. Support in Dutch, French and English.

NLFREN
1997Founded in Belgium
45,000+Vorne XL installations worldwide
50+Countries served
BeneluxHome market, European delivery

Start with one real requirement

Whatever your entry point, ACI helps you turn production data into decisions that move performance. Start small. Build on what works.

Based in Bonheiden, Belgium · Serving Benelux and Europe · NL · FR · EN

Free: OEE Health Check Guide
=
Free Download

Before You Go — Get Your OEE Benchmarking Guide

See how your OEE compares to industry benchmarks. Practical insights from 25+ years on European production floors.

=
No spam. Unsubscribe anytime. We respect your data.
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.