Case Studies
Measured Results From Real Plants
Documented OEE improvements from manufacturers — what was lost, what we changed, and what it returned.
Case Study
Real Time Visibility in Every Pocket
With XL Sidekick across five lines, supervisors stopped walking to check status and started acting on it.
Case Study
From conflicting OEE numbers to one trusted standard
How standardised OEE and downtime measurement across every line at a regulated manufacturing site — so the plant stopped arguing…
Case Study
Giving a manual assembly line its first real OEE
Automated lines get a Vorne board. Manual benches never did — so the losses on them stayed invisible. In this…
Case Study
Cutting changeover time on a high-mix filling line
With 200+ SKUs and changeovers averaging 47 minutes, a contract beverage filler was losing 3+ hours of production every day.…
Case Study
Finding hidden capacity across three packaging lines
A fast-moving consumer goods site believed its three packaging lines were at maximum capacity and was budgeting €2M for a…
Case Study
From Firefighting to Short Interval Control
An automotive supplier moved from reacting to losses to managing them, with daily fact-based control using IntelliSuite.
Case Study
Trusted OEE data, finally
In a regulated site, the numbers have to be right. After Foundation training the team had one source of truth…