A fast-moving consumer goods site believed its three packaging lines were at maximum capacity and was budgeting €2M for a fourth. XL 810 revealed 23% hidden capacity — enough to defer the investment entirely.
At a glance
- Industry: FMCG (personal care products)
- Lines: 3 high-speed packaging lines
- Products used: XL 810
- Timeline: 8-week analysis and improvement cycle
The problem: “we need a fourth line”
Demand was growing 8% year-on-year and the three existing lines ran 24/5. Operations reported they were at 94% capacity utilisation and presented a business case for a fourth line at €2M plus 6 months of installation downtime. But the 94% figure was based on scheduled time, not on OEE. Nobody had measured what the lines were actually producing versus what they could produce.
What was done?
XL 810 was installed on each line for structured downtime and reject capture, and configured OEE Explorer to run multi-line comparison dashboards. After four weeks of clean data, XL810 loss waterfall showed where the capacity was hiding: 9% in minor stops under 2 minutes (not previously tracked), 7% in changeover overruns, and 7% in speed losses where lines ran below rated capacity.
Results after 8 weeks of focused improvement
- Hidden capacity found: 23% across three lines
- OEE: from 64% to 76% (+12 points)
- Throughput: +19% on existing lines (equivalent to 0.6 of a fourth line)
- Capex avoided: €2M fourth-line investment deferred by at least 18 months
- Minor stops (under 2 min): −62% through operator awareness and minor mechanical fixes
How?
XL 810 provided the data; our consulting structured the response. The improvement programme prioritised losses by financial impact, assigned owners, and tracked countermeasures weekly. The CFO later noted that the XL dashboards paid for themselves in the first month by preventing an unnecessary capital expenditure.